Centene Pedestrian Bridge Project

 

Budrovich Contracting was proud to assist HWP Rigging in this highly specialized project on the Centene Campus in Clayton, MO.  Two 275 Ton Mobile Hydraulic cranes were utilized to hoist the pedestrian bridge, weighing approximately 254,000 lbs, from a staging location onto a turntable platform that had 1.5 million lbs of carrying capacity.

It’s our mantra that all of our workers and yours
go home in the same condition they came to work in.

Budrovich’s commitment to safety is second to none in our industry.
Having two very active safety committees further integrates safety into our work process.
For us, safety is always part of the process rather than being secondary to completing the task.