Budrovich Contracting was proud to assist HWP Rigging in this highly specialized project on the Centene Campus in Clayton, MO. Two 275 Ton Mobile Hydraulic cranes were utilized to hoist the pedestrian bridge, weighing approximately 254,000 lbs, from a staging location onto a turntable platform that had 1.5 million lbs of carrying capacity.